Installation Manual

Table Of Contents
R20 1X UBS Macro B T S Hardw are Installation T ask 16: Connecting 220 V AC P ower
Task 16: Connecting 220 V AC Power
Objectives
T ask 16 is performed for 220 V AC UBS Macro BTS only .
The objectives of this procedure are as follows:
A ttaching customer supplied wiring and conduit for 220 V AC lines.
Connecting wires and required insertion bridges to the AC INP UT terminal block on the
rear of the AC PSM shelf .
Routing the loose ends of the wires to the site 220 V AC source for connection to the source.
V erify that the +27 V DC output power cable from the PSM shelf is already
connected to the PDU +27 V DC input power cable. This was performed during
T asks 4 -7.
Frame AC power cables and wiring information
The AC PSM shelf and AC PSMs can operate with the following AC power inputs:
Input AC V oltage R ange: 154 V AC to 300 V AC
Single -Phase
3 -Phase ST AR
3 -Phase DEL T A
Consider the following AC power input circuit characteristics:
The AC PSM shelf terminal block has seven terminals; one for Ground plus six for AC
line wires and insertion bridges.
The AC PSM shelf terminal block Ground terminal can accommodate a wire size range of
2 A WG to 10 A WG .
The AC PSM shelf terminal block AC line terminals can accommodate a wire size range of
2 A WG to 10 A WG .
68P09283A62 -3 2 -65
PRELIMINARY A UG 2007