User Manual

Information Ov erview Chapter 1: Ov erview
Chapter 6: S SI Replacement Procedures
S SI (Site Span I/O) Module
Unbalanced E1 Daughter Card
QHSO (Quartz High Stability Oscillator)
Chapter 7: XMI Replacement Procedures
XMI (Transceiver Module Internal) Module
XMI F an Tray Assembly
Chapter 8: DMI Replacement Procedures
DMI (Digital Module Internal) Assembly
Modem Boards
Chapter 9: PDU Replacement Procedures
P ower Distribution Unit (PDU)
Breaker Module Assembly (BMA)
Chapter 10: PSM Shelf Replacement Procedures
–48 V DC P ower Supply Module (PSM) Shelf
220 V AC P ower Supply Module (PSM) Shelf
P ower Supply Modules (PSMs)
Chapter 11: RX Splitter Replacement Procedure
Chapter 12: RGPS Head Replacement Procedure
Each BTS FRU procedure section contains the following information:
Description - contains general information about the FRU operation, usage and location in
the frame/shelf and so on.
System impact/considerations - describes how the replacement procedure impacts the
system with respect to downtime and so on. It lists specific concerns associated with the
replacement of the FRU .
Required items - lists items that are required to perform the FRU procedure including
reference documents (manuals), tools, torque requirements, and replacement unit.
Prerequisite - highlights actions needed before and after the FRU replacement including:
coordinating the replacement procedure with the OMCR operator and so on.
Replacement procedure - provides detailed procedural steps to remove the failed FRU
and install the replacement FRU including: site preparation, equipment disassembly and
reassembly , equipment and site operation restoration and so on. When necessary , the
procedural steps reference specific procedures to be performed by the OMCR operator .
1 -4 68P09283A64 -3
FOA SEP 2007