Specifications

Introduction to Calibr ation Appendix E: Optimization and Calibr ation Procedures
Introduction to Calibration
Overview
This appendix is not normally applicable to the UBS , but is provided for reference.
This section describes procedures for isolating the UBS from the span lines, preparing and
using the LMF , downloading system operating software, set up and calibration of the supported
test equipment, and transmit/receive path verification.
Before using the LMF , use a browser to view the
CA VEA TS
section in the
readme.html
file in the LMF home directory (e.g., c:\wlmf) for any applicable information.
Optimization Process Summary
A fter a UBS is physically installed and the preliminary operations, such as power up, have
been completed, the LMF is used to optimize the UBS . The basic optimization process consists
of the following:
E -2 68P09283A63 -5
FOA A UG 2007