Specifications
1X UBS Macro B T S Optimization/A TP FRU Optimization/A TP T est Matrix
Not every procedure required to bring the site back on line is indicated in T able B -2 .
It is meant to be used as a guideline
ONL Y
. The table assumes that the user is
familiar enough with the UBS Optimization/A TP procedure to understand which test
equipment set ups, test set calibrations, and UBS site preparation will be required
before performing the T able # procedures referenced.
V arious passive UBS components (such as the TX and RX directional couplers, etc.) only call for
a TX or RX calibration audit to be performed in lieu of a full path calibration. If the RX or TX
path calibration audit fails, the entire RF path calibration will need to be repeated. If the RF
path calibration fails, further troubleshooting is warranted.
Whenever any unit is replaced, it is assumed that only power to the unit being replaced is
turned off via the breaker supplying that unit.
Table B -2 Full A TP T est Matrix
T est
Procedure Description
Reference
RX Cables Run the appropriate LMF applications
RS SI T est
FER T est
5
5
TX Cables Run the appropriate LMF application TX Audit
4
GPS
Run the appropriate LMF applications
GPS
Initialization/V erification
TX Audit
RS SI T est
W aveform Quality A TP
Pilot Time Offset A TP
Code Domain
P ower/Noise Floor
FER T est
•
*
6
*
*
6
6
OPTIMIZA TION AND TEST LEGEND
• Required
* P erform if necessary for additional fault isolation, repair assurance, or site certification
1 P erform on all carrier and sector TX paths to the UBS .
2 P erform on all carrier and sector RX paths to the UBS .
3 P erform on all primary and redundant TX paths of the affected carrier .
4 P erform on the affected carrier and sector TX paths.
5 P erform on the affected carrier and sector RX paths.
6 V erify performance by performing on one sector of on carrier only .