Usage & Background
Re -optimization of specific portions of the site may be required. An outline of some basic
guidelines is included in the following tables.
Re -optimization steps listed for any assembly detailed in the tables below must be
performed anytime an RF cable associated with it is replaced.
UBS Optimization Required
Table B -1 When Optimization is R equired
Item Replaced
Optimize
XMI, IDRF , DMI, S SI, CRMS
All sector / carrier TX / RX paths
Detailed Reduced ATP
There Reduced A TP consists of the TX Audit and RS SI tests.
Detailed Optional Full ATP Test Matrix
T able B -2 outlines the optional A TP tests that would need to be performed if the user wants to
fully test the UBS components or if the reduced A TP fails. It is also assumed that all modules
are placed in a Locked State via the LMF .
The following guidelines should also be noted when using this table.
B -2 68P09283A63 -5
FOA A UG 2007