Specifications

Prepare to Lea v e the Site Chapter 5: Lea v e the Site
Procedure 5 -4 LMF T ermination and R emo v al Procedure
1
From the Local T erminal window select File > Exit .
Anytime the LMF is exited from the UBS , the DMI controller(s)
will automatically reboot within 1 minute in order to clear out any
test configurations and boot up under the original configuration in
the NECB and NECJ files.
2
From the W indows T ask Bar click Start > Shutdown .
Click Y es when the Shut Down W indows message appears.
3
Disconnect the LMF terminal Ethernet connector from the UBS cabinet.
4
Disconnect the LMF serial port, the RS -232 to GPIB interface box, and the
GPIB cables as required for equipment transport.
Reset All Devices and Initialize Site Remotely
Devices in the UBS should not be left with data and code loaded from the LMF . The configuration
data and code loads used for normal operation could be different from those stored in the LMF
files. P erform the procedure in Procedure 5 -5 to reset all devices and initialize site remotely .
Procedure 5 -5 R eset UBS Devices and R emote Site Initialization
1
T erminate the LMF session by following the procedure in Procedure 5-4
2
V erify that the OMC-R operator has re-activated the spans.
3
V erify at the OMC-R that the UBS has been integrated and has synchronized
its code and data.
4
Account for all tools used and all parts removed.
5
V isually inspect the UBS for any foreign objects and remove them.
6
V isually inspect all cable connections, ensuring that they are connected as
required for normal UBS operation.
7
V erify no alarm conditions are being reported to the OMC-R.
8
A fter all activities at the site have been completed, contact the OMC-R and
confirm that the UBS is under OMC-R control.
5 -8 68P09283A63 -5
FOA A UG 2007