Specifications
1X UBS Macro B T S Optimization/A TP Prepare to Lea v e the Site
Prepare to Leave the Site
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
■
■
External Test Equipment Removal
P erform the procedure in Procedure 5 -3 to disconnect the test equipment and configure the
UBS for active service.
Procedure 5 -3 External T est Equipment R emo v al Procedure
1
Disconnect all external test equipment from all TX and RX connectors on
the UBS .
2
Reconnect and visually inspect all TX and RX antenna feed lines on the UBS .
V erif y that all sector antenna feed lines are connected to the correct ports on the
fr ame. Crossed antenna cables will cause system degr adation of call processing.
LMF Removal
Before removing the LMF , verify that the UBS code load is synched with the code load in the
OMC -R.
DO NOT power down the LMF without performing the procedure below .
Corrupted/lost data files may result, and in some cases, the LMF may lock up
F ollow the procedure in Procedure 5 -4 to terminate the LMF session and remove the terminal.
Continued
68P09283A63 -5 5 -7
FOA A UG 2007