Product Card

Acceptance T est Procedures - TX & RX Chapter 4: Acceptance T est Procedures
Required Test Equipment
The following test equipment is required:
LMF
P ower Meter
Communications System Analyzer
Before connecting an y test equipment directly to an y UBS TX OUT connector ,
verify that there are no CDMA channels keyed .
A t activ e sites, ha v e the OMC -R oper ator place the carrier assigned to the UBS
under test OOS . F ailure to do so can result in serious personal injury and/or
equipment damage.
T est equipment must be calibrated and the cables re -calibrated before using them to
perform acceptance tests.
ATP Test Prerequisites
Before attempting to run any A TP tests, ensure the following have been completed:
LMF is logged into the UBS .
All FRUs on the LMF screen are INS (Green)
T est cables are calibrated
T est equipment is connected for A TP tests (refer to A TP T est Setup illustrations in the T est
Equipment Set Up section of Appendix E Optimization and Calibration Procedures )
T est equipment has been selected in the LMF , warmed up 60 minutes and calibrated
All required Ethernet test equipment connections are made
UBS transmit connectors are terminated with either non -radiating loads or connected to
the test equipment as specified in Figure 3 -27 through Figure 3 -30 .
4 -8 68P09283A63 -5
FOA A UG 2007