Product Card

1X UBS Macro B T S Optimization/A TP Acceptance T est Procedures - TX & RX
Procedure 4 -2 Procedure for RS SI Acceptance T esting (Continued)
5
Select the RX Branch to be tested from the choices in the drop down list
provided (Both, Main, Diversity)
6
Enter the appropriate power level into the Generator amplitude box (default:
-80 dBm)
7
Click OK . A status bar will be displayed followed by a Directions pop up
window .
8
F ollow cable connection directions as they are displayed, and click the
Continue button to begin testing. Progress will be indicated in the status bar .
9
When the test is completed, click Save Results or Dismiss button, as
required, in the Status Report window .
If Dismiss is selected, then the test results will not be saved.
Automated ATP
This section covers the general requirements and procedures for conducting both automated
A TP testing and performing individual A TP tests.
Automated ATP Test Options
Acceptance tests can be run individually or as one of the following automated groups:
All TX: TX tests verify the performance of the UBS transmit line up.
All RX: RX tests verify the performance of the UBS receiver line up.
All TX/RX: Executes all the TX and RX tests.
Full Optimization: Executes the TX calibration, downloads the BLO , and executes the TX
audit before running all of the TX and RX tests.
The Full Optimization test can be run if TX path calibration is needed before the TX
and RX acceptance tests are run.
The STOP button can be used to stop the testing process.
The LMF is optimized to perform the tests as quickly as possible when selecting the
“perform all" menu options. It is recommended that the user select this option on a
per sector/carrier option where possible to save time.
68P09283A63 -5 4 -7
FOA A UG 2007