Product Card
Introduction to A TP Chapter 4: Acceptance T est Procedures
Introduction to ATP
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
■
■
Introduction
General
The Acceptance T est Procedures (A TP) allow Cellular Field Engineers (CFEs) to run automated
acceptance tests on all UBS subsystem devices equipped in the NEC using the LMF and the
test equipment it supports.
LMF User Interface
This chapter provides procedures for performing acceptance testing from the LMF Graphical
User Interface (GUI) environment, the recommended method. The GUI provides the advantages
of simplifying the LMF user interface, reducing the potential for mis -keying commands and
associated parameters, and speeding up the execution of complex operations involving multiple
command strings. If it is believed the LMF command line interface (CLI) will provide additional
insight into A TP operation or unexpected test results, refer to LMF CLI Reference.
Test Reports
The CFE can choose to save the results of A TP tests to a report file from which A TP reports are
generated for later printing. See the Generating an A TP Report section in this chapter .
Test Equipment Selection
Because test equipment functions during acceptance testing are controlled by the LMF directly ,
only the test equipment models supported by the LMF can be used.
1. Before using the LMF , read the Dev eloper R elease Notes for WinLMF section in
the LMF Help function on -line documentation for an y applicable information. P a y
particular attention to the Ca v eats/Known Issues part of this appendix.
2. The A TP test is to be performed on out -of -service sectors only .
3. DO NO T substitute test equipment with other models not supported b y the LMF .
4 -2 68P09283A63 -5
FOA A UG 2007