Product Card

1X UBS Macro B T S Optimization/A TP Initial P ower -up T ests
Initial Power -up Tests
Power -up Procedures
P otentially lethal v oltage and current lev els are routed to the UBS equipment. This
test must be performed with a second person present, acting in a safet y role. R emo v e
all rings, jewelry , and wrist w atches prior to beginning this test.
DC Input Power
In the tests to follow , before applying any power , verify the correct power feed and return cables
are connected between the power supply breakers and the power connectors of the UBS .
P ower will first be verified at the input to each UBS . A fter power is verified, modules within
the UBS itself will be powered up and verified one at a time.
Motorola recommends that the DC input power cable used to connect the UBS to the main DC
power source conforms to the guidelines outlined in
1X UBS Macro BTS Hardware Installation
68P09283A62.
Common Power Supply Verication
P erform Procedure 2 -2 on any UBS connected to the common power supply at the site after the
common power supply has been installed and verified per the power supply OEM suggested
procedures.
Mak e sure the connector adapters are securely attached to each of the UBS power
feeds and returns. Also , mak e sure the cables ha v e been properly installed into each
connector . Loose power cables ma y cause a re.
Continued
68P09283A63 -5 2 -5
FOA A UG 2007