Product Card

Introduction Chapter 2: Preliminary Oper ations
Introduction
This section first verifies proper frame equipage.
Cell Site Types
Sites are configured as omni, 2–sector or 3–sector with a maximum of two carriers. F or more
information on the differences in site types, please refer to the 1X UBS Macro BTS Hardware
Installation manual.
NEC Files
The Network Element Configuration (NEC) files contains site type and equipage data
information and passes it directly to the LMF during optimization. The number of sector -carriers
and carrier frequency assignments are two of the equipage data included in the NEC files.
Be sure that the correct NECB–<version information>–bts#.xml and NECJ–<version
information>–bts#.xml les are used for the specic UBS site. These should be the
NEC les that are pro vided for the UBS b y the OMC –R. Code v ersion of the UBS should
be synched with the code in the OMC -R before lea ving the site. F ailure to use the
correct NEC les can cause system errors. F ailure to use the correct NEC les to log
into a site can cause incorrect calibr ation information to be gener ated.
Site Equipage Verication
Review the site documentation. Match the site engineering equipage data to the UBS and
optional equipment installed at the site. Physically inspect and verify the equipment provided
for the UBS .
Alw a ys wear a conductiv e, high impedance wrist str ap while handling an y circuit
card/module to prev ent damage b y ESD . After remo v al, the card/module should be
placed on a conductiv e surface or back into the anti–static shipping container .
2 -2 68P09283A63 -5
FOA A UG 2007