Manual

P ack et B T S start -up procedures Chapter 3: R eference Procedures P erformed A t OMCR
Packet BTS start -up procedures
Restore site signaling operations for a packet BTS
Restore site signaling operations according to Procedure 3 -3 .
Procedure 3 -3 R estore site signaling oper ations procedure for a pack et B T S
At the OMCR
1
Open a CLI window . Refer to Accessing OMCR CLI window on page 3- 3 .
2
Unlock/enable the BTS by entering either of the following commands at the prompt:
omc-000000> ENABLE BTS-<bts#> UNC
omc-000000> UNLOCK BTS-<bts#>
3
V erify that the system automatically returns a Network Element State Change Event
message for the BTS . These messages show the old and new states for the devices. The new
state should be UNLOCKED/ENABLED/ACTIVE .
4
Display the status of all devices at the BTS by entering the following command at the prompt:
omc-000000> DISPLAY BTS-<bts#> STATUS
5
Examine the response to make sure there are not more OOS_AUTOMATIC devices than were
recorded in step 24 of Procedure 3-2 .
Devices that were previously OOS_AUTOMATIC may now be INS .
6
P erform one of the following depending on redirection actions taken in Procedure 3-2 :
If subscribers were not redirected according to the steps in Procedure 3-2 , stop here.
If subscribers were redirected according to Procedure 3-2 , perform the remaining
steps of this table.
7
Enter the following command at the prompt to display the congestion control parameters for
all carriers equipped for the BTS:
omc-000000> DISPLAY BTS-<bts#> CONGESTCONF
Continued
3 -10 68P09283A64 -3
FOA SEP 2007