Installation Manual
Ov erview Chapter 2: UBS Macro B T S Installation Procedure
Overview
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
■
■
Introduction
This chapter provides the information and procedures to install the items and cabling for the
UBS Macro BTS . Both pictorial and textual information is presented.
The installation is broken into a set of tasks. Each set of tasks is broken down into a set of steps.
Individual tasks or steps are based on the overall installation sequence and must not be
performed randomly .
Structural engineer
A Structural Engineer has to determine the method and equipment needed to mount the rack to
the floor .
Required items
F or each set of tasks, a list of tools and items is given that covers those specific tasks.
A full list of tools is given in T ools and materials on page 1 - 16 .
Cabling and conguration options
All of the configurations require unique cables and/or items. Installation of all cables and all
items is covered. When applicable, the cabling and configuration options are called out. Not all
cables or items covered in this manual should be installed. Consult the site plan to determine
exactly what items to install.
Color coding
Many of the connectors and cables are color coded. As the cables are installed, the cable
color code should match the color code of the connector . Not all cables and connectors are
color coded.
Some, but not all, of the color coding is called out in the installation procedures. The scheme of
the color codes is shown in T able 2 -1 and T able 2 -2 .