Installation Manual
F or Software Release 2.20.x, only low and mid capacity frames are available/supported.
High capacity UBS Macro BTS frames will be available in the future.
The manual covers the following topics:
• Chapter 1 provides a brief description of the information presented in the manual, frame
identification information, installation sequence, and a list of tools.
• Chapter 2 provides illustrations displaying the location of all UBS Macro connectors for
external cabling and wiring purposes, external cable run list, and a detailed installation
sequence. Installation procedures cover mounting items to the rack and installing the
external cabling.
• Chapter 3 provides information and procedures needed for expanding the low -capacity
UBS Macro BTS starter/expansion frame to the mid -capacity frame configuration.
• Chapter 4 provides procedures for cleaning up the site and the installation completion
checklist.