Installation Instructions
1X UBS Macro B T S FRU XMI (T r ansceiv er Module Internal) Module
XMI Installation Procedure
F ollow the steps in Procedure 7 -2 to install the XMI.
Procedure 7 -2 XMI Installation Procedure
A T THE BTS SITE
The XMI module is hea vy . T wo people are required to lift, carry , or handle the
XMI module.
• Be sure the remo v able XMI handle is attached to the front of the XMI before
ph ysically handling the module.
• Be sure two people use both hands and wear protectiv e footwear when
handling the XMI.
• Be sure to use two people to support the module while sliding the module
out of or into the shelf slot.
An XMI module that is not in a shelf should alw a ys be set on its side and nev er on
its edge. This will prev ent the XMI module from tipping o v er and causing damage
or injury .
1
The replacement XMI module should already have the removal handle attached.
If handle
is not
attached, go to step 2 .
If handle is attached, go to step 3 .
2
A ttach the removable XMI handle to the front of the replacement XMI module (see Figure 1-9
800 MHz XMI Module Front P anel I/O Detail on page 1- 38 or Figure 1-10 1.9 GHz XMI
Module Front P anel I/O Detail on page 1- 39 for location of XMI handle mounting screw
holes) as follows:
• Align handle screw holes with handle mounting screw holes on the XMI front panel.
(Note handle orientation; handle is not symmetrical.)
• Insert two M5 screws.
• Using a T25 TORX driver , tighten the screws to 3.2-3.6 N-m (28-32 in-lb).
Continued
68P09283A64 -3 7 -19
FOA SEP 2007