User Manual
Gener al T est Equipment Selection, Calibr ation, and Oper ation R equirements Chapter 1: Introduction
Equipment Warm–up
A fter arriving at the a site, the test equipment should be plugged in and turned on to allow warm
up and stabilization for as long as possible. The following test equipment items must be warmed
up for a minimum of 60 minutes prior to use for UBS calibration.
• Communications T est Set
• P ower Meter
1 -8 68P09283A63 -5
FOA A UG 2007