User's Manual
Index
68P09258A31–A
Oct 2003
1X SCt 4812T BTS Optimization/ATP
Index-9
Troubleshooting
BBX2 Control Good – No (or Missing) Span Line
Traffic, 6-17
BLO Calibration Failure, 6-7
C–CCP Backplane, 6-14, 6-15
Calibration Audit Failure, 6-8
Code Domain Power and Noise Floor Measurement
Failure, 6-10
Code Download Failure, 6-5
Communications Analyzer Communication Failure,
6-4
CSM Checklist, 6-12
Data Download Failure, 6-5
DC Power Problems, 6-19
Device Enable (INS) Failure, 6-6
Login Failure, 6-3
MGLI2 Control Good – No Control over AMR,
6-17
MGLI2 Control Good – No Control over
Co–located GLI2, 6-16
Miscellaneous Failures, 6-6
Multi–FER Failure, 6-11
No BBX2 Control in the Shelf – No Control over
Co–located GLI2s, 6-17
No DC Input Voltage to any C–CCP Shelf Module,
6-20
No DC Input Voltage to Power Supply Module,
6-19
No GLI2 Control through Span Line Connection,
6-16
No GLI2 Control via LMF, 6-16
No MCC24 Channel Elements, 6-18
Power Meter Communication Failure, 6-3
Rho and Pilot Time Offset Measurement Failure,
6-9
Set span configuration, 6-32
span problems, 6-29
TX and RX Signal Routing, 6-20
TX Mask Measurement Failure, 6-9
TSU NAM
Parameters, 3-102
Program, 3-108
TX
acceptance tests, equipment setup, 4-6
antenna VSWR, test data sheets, A-17
TX & RX Path Calibration, 3-85
TX and RX Frequency vs Channel
1700 MHz, E-8
1900 MHz, E-3
800 MHz, E-5
TX and RX Signal Routing, C–CCP Backplane
Troubleshooting, 6-20
TX ATP Setup, 3-72
TX Audit Test, 3-95
TX BLO, test data sheets
Offset/Power Output Verification, A-10
Power Output Verification, A-15
Tx BLO Nominal Offset, Setup for TX Cal, 3-91
TX calibration, 3-92
All Cal/Audit, 3-92
set–up, Agilent 8935,
3-65, 3-68
RX Frame Error Rate (FER) ATP Background, 4-14
TX Code Domain Power/Noise Floor ATP
Background, 4-13
TX Mask Verification, spectrum analyzer display,
illustration, 4-12
TX OUT connection, 4-5
TX Output Acceptance Tests
Code domain power, 4-7
Pilot Time Offset, 4-7
Spectral purity TX mask, 4-7
Waveform quality (rho), 4-7
TX Path, calibration, 3-86
TX path
audit, 3-95
calibration, 3-89
TX path calibration, 3-92
TX Pilot Time Offset ATP Background, 4-13
TX Spectral Purity (Tx Mask) ATP Background, 4-11
TX Waveform Quality (Rho) ATP Background, 4-12
U
Updating Calibration Data Files
Copy and Load Cal File to to CBSC, 5-2
Software Release caveats, 5-2
UTP, LMF to BTS connection, 3-17
V
Verification of Test Equipment, data sheets, A-2
Verify GLI ROM code load, 3-37
Voltage Standing Wave Ratio. See VSWR
VSWR
Advantest Test Set, I-5
Calculation, I-4, I-6
Equation, I-4, I-6
manual test setup detail
Advantest illustration, I-7