User's Manual
Index
68P09258A31–A
Oct 2003
1X SCt 4812T BTS Optimization/ATP
Index-5
GPIB Address
Advantest R3267, F-8
Advantest R3465, F-12
Advantest R3562, F-9
Agilent (formerly HP) 8935, F-10
Agilent E4406A, F-6
Agilent E4432B, F-7
Gigatronics 8541C Power Meter, F-15
Hewlett Packard HP8921a & HP83236A/B, F-11
Motorola CyberTest, F-13
GPIB Interface Box, RS232, F-16
GPS
Initialization/Verification, 3-48
receiver operation, test data sheets, A-6
redundancy alarm tests, 3-116
Test Equipment Setup, 3-46
GPS Bad RX Message Type, 6-12
GPS satellite system, 3-41
Graphical User Interface, 3-19
GUI, 3-19
Logging Out, 3-29
H
Hardware Requirements, 1-7
Hewlett Packard HP8921A and HP83236A/B GPIB
Address, F-11
High Stability 10 MHz Rubidium Standard, 1-11
High–impedance Conductive Wrist Strap, 1-10
HP 437, setting GPIB address, F-14
HP 437B, 3-57
HP 83236 A, F-19
HP 83236A, F-18
HP 8921, 3-57
HP 8921A, System Connectivity Test, F-18
HP 8935, 3-57
HP PCS Interface Test Equipment Setup for Manual
Testing, F-23
HP Test Set, VSWR, I-3
HSO
Initialization/Verification, 3-54
redundancy/alarm tests, 3-116
HSO Initialization/Verification, 3-44
HyperTerminal Connection, Creating, 3-13
I
I and Q values, B-2
In–Service Calibration, H-13, H-16
Individual ATP Test Background
Code Domain Power/Noise Floor, 4-13
Pilot Time Offset, 4-13
RX Frame Error Rate (FER), 4-14
Tx Mask, 4-11
Waveform Quality (Rho), 4-12
Initial Installation of Boards/Modules, preliminary
operations, 2-3
Initial power tests, test data sheets, A-4
Initial power–up
BTS frame, 2-15
RFDS, 2-15
Initialization/Verification
GPS, 3-48
HSO, 3-54
LFR, 3-52
Inter–frame cabling, when to optimize, C-3
IOS Version Verification, J-13
IP Addresses, Agilent E7495A, 3-75
IS–97 specification, B-2
ISB connectors, 6-14
Isolation, T1/E1 Span, 3-15
Itasca Alarms Test Box, 1-11
L
LAN
BTS frame interconnect, illustration, 3-33
Tester, 1-11
LAN Connectors, GLI2, 6-24
LED, CSM, 3-43
LED Status, 6-21
BBX2, 6-27
CSM, 6-22
DC/DC Converter, 6-21
GLI2, 6-23
LPA, 6-28
MCC, 6-27
LFR
Initialization / Verification, 3-52
receiver operation, test data sheets, A-7
redundancy/alarm tests, 3-116
LFR/HSO, Test Equipment Setup, 3-46
LIF, Load Information File, 3-9