User's Manual Part 4

Index – continued
MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU Index-3
PRELIMINARY
E
E1, isolate BTS from the E1 spans, 6-16
E4406A, calibration, B-28
Enable CSMs. See CSM
Equipment, warm–up, required test equipment, 1-14
Equipment warm-up, 6-55
establish MMI communication, 6-30
Ethernet LAN, interconnect diagram, 6-33
Ethernet LAN termination, 6-3
External Test Equipment Removal, 8-3
F
Failure report generation, 7-23
FER, acceptance test, 7-21
Files, intermediate file, 7-23
files, calibration data, 6-77
Fluke, model 8062A with Y8134 test lead kit, test
equipment, 1-19
Folder Structure Overview, 6-9
Frame, equipage preliminary operations, 6-1
Frequency counter, optional test equipment, 1-19
G
General Purpose Interface Bus, IEEE–488 protocol
interface bus. See GPIB
Generating an ATP Report, 7-23
Gigatronics 8541C Power Meter GPIB Address, B-15
Gigatronics 8542 power meter, calibration, B-31
GPIB, B-17 , B-21 , B-22
cables required test equipment, 1-17
set address, HP 437B, B-14
GPIB Address
Advantest R3267, B-7
Advantest R3465, B-12
Advantest R3562, B-9
Agilent (formerly HP) 8935, B-9
Agilent E4406A, B-5
Agilent E4432B, B-6
Gigatronics 8541C Power Meter, B-15
Hewlett Packard HP8921a & HP83236A/B, B-11
Motorola CyberTest, B-13
GPIB Interface Box, RS232, B-16
GPS Initialization/Verification
estimated position accuracy, 6-46
surveyed position accuracy, 6-46
GPS satellite system, 6-41
GUI, 6-19
H
Hardware Requirements, 1-15
Hewlett Packard, 10833A or equivalent, required test
equipment, 1-17
Hewlett Packard HP8921A and HP83236A/B GPIB
Address, B-11
High–impedance conductive wrist strap, required test
equipment, 1-18
HP 437
Pre–calibration, B-29
setting GPIB address, B-14
HP 83236A, B-21
HP 8921A PCS interface, Cables Connection for 10
MHz Signal and GPIB , B-18 , B-20
HP 8921A/600 test set, 1-16
HP8921A, B-21
Test equipment connections , B-17
HyperTerminal, Creating named HyperTerminal
connection, 6-14
HyperTerminal , create named connection, 6-14
I
IEEE–488 protocol interface bus. See GPIB
Initial HP8921A setup, B-32
Initial Installation of Boards/Modules, preliminary
operations, 6-2
Intermediate file, generate ATP file using, 7-23
L
LAN, tester optional test equipment, 1-19
LAN termination, 6-3
LED, CSM, 6-43
LIF, Load Information File, 6-10
LMF, B-17 , B-22
1X FER acceptance test, 7-4