User's Manual Part 4
Index – continued
Index-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004
PRELIMINARY
RX sensitivity/frame error rate, 7-10
system software download, 6-6
BTS Frame Erasure Rate. See FER
BTS Log In Procedure, GUI, 6-25
BTS login
CLI environment, 6-27
General, 6-25
GUI environment, 6-25
BTS Logout
CLI environment, 6-29
GUI environment, 6-28
Create CAL File, 6-88
C
cable calibration, automatic, test set–up, 6-56
Advantest R3267/R3562, 6-57
Advantest R3465, 6-56
Agilent 8935, 6-56
Agilent E4406A/E4432B, 6-57
CyberTest, 6-56
HP 8921A, 6-56
CAL file. See calibration data file
Calibrate Test Cabling Using Signal Generator &
Spectrum Analyzer, 6-71
Calibrating, Test Equipment, 6-68
Calibrating Cables, Overview, 6-69
Calibrating Test Cable Setup, PCS Interface
HP83236B, B-32
Calibrating Test Cabling using Communications
System Analyzer, 6-70
Calibration, required test equipment, 1-14
calibration
calibration data file, 6-77
Gigatronics 8542B, B-31
calibration data file, description of, 6-77
Cannot communicate to Power Meter, 11-5
CCP shelf illustration, left side, 1-24
CDF, 6-5
site equipage verification, 6-6
site type and equipage data information, 6-1
CDMA, subscriber mobile radiotelephone, optional
test equipment, 1-19
Cell Site
equipage verification, 6-2
types configuration, 6-5
Cell Site Data File. See CDF
CLI, 6-24
Clock Sync Module. See CSM
Code domain power/noise floor
acceptance test, 7-18
analyzer display, 7-20
Command Line Interface, 6-24
Communication test set, rear panel, B-18 , B-20
communications test set, TX acceptance tests, 7-4
Connect BTS E1/T1 spans, 8-4
Connect BTS T1/E1 spans, 8-4
Connecting test equipment to the BTS, 6-51
Control, TX output verification, 7-4
Copy and Load Cal File to to CBSC, 8-1
Copy BTS CDF (or NECF) and CBSC CDF Files to
the LMF, 6-12
Copying CAL files from CDMA LMF to the CBSC,
8-1
Copying CAL files to the CBSC, 8-2
CSM
clock source, select, 6-40
enable, 6-41
LEDs, 6-43
system description, 6-43
CSM clock source, select, 6-40
CSM frequency verification, 6-45
D
Devices, download. See Download
Digital multimeter, required test equipment, 1-19
Download
See also Devices
BTS, 6-36
BTS system software, 6-6
Download BLO Procedure, 6-84
download ROM and RAM code. See ROM code
Download/Enable MCCs, 6-42
Download/Enable MGLIs, 6-39