User's Manual Part 4

New Packet BTS Installation with IBR
H-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004
PRELIMINARY
New Packet BTS Installation
This section covers the actions necessary for implementing IBR packet
capability in the installation of a new BTS. Procedures unique to this
implementation are contained in this section. When procedures required
in this implementation are contained in other parts of this publication or
in other publications, the user will be specifically directed to them at the
appropriate places in this section.
Prerequisites
The following must be accomplished prior to traveling to the BTS site
for IBR implementation:
S The BTS has been installed as described in Chapter 4 of this manual.
S One of the following:
GLI3 card(s) for the site have been verified as having IBR–capable
software image installed
Motorola Field Operations or Account Team member is identified
to travel to the BTS site to perform GLI3 IBR–capable software
installation, if required
S GLI3 card(s) for the BTS are on hand for transport to the BTS site or
are verified to be at the BTS site
S Required publications to support IBR implementation activities are on
hand for transportation to the BTS site
Implementing IBR Functionality
Follow the procedure in Table H-1 to implement IBR functionality for
the BTS.
Table H-1: Implement IBR Functionality in New BTS
Step Action
1 Upon arrival at the site, contact the OMC–R and notify the operator that site operations are starting.
2 If the BTS has not been initially powered up, apply power to the BTS in accordance with the Power
Pre–Power–up Tests and Initial Power–up Tests and Procedures described in Chapter 5 of this manual.
3 Once the BTS is fully powered up with these procedures, the GLI3 card should have been seated in the
correct slot. If it is not, seat the card at this time and allow each to complete its initialization.
4 If it was not previously done, follow the procedure in Table G-2 to:
S Verify the software version in the GLI3 card(s)
S Verify the span parameter settings in each GLI3 card match those established for the site in the
OMC–R database
5 If the GLI3software requires upgrading for IBR capability, request Motorola Field Operations or
Account Team assistance in upgrading the software.
6 If GLI3 card span parameter settings do not match those required, change them as necessary by
following the procedure in Table G-3.
. . . continued on next page