User's Manual Part 3
Reference Procedures Performed At OMC–R
MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU 10-1
PRELIMINARY
Introduction
The procedures in this chapter are referenced during various FRU
replacement procedures and are performed by the OMC–R operator.
These reference procedure covers the following:
S Accessing OMCR CLI window
S Circuit BTS shut down and restore procedures for:
– BTS
– Sector
– Carrier
S Packet BTS shut down and restore procedures for:
– BTS
– Sector
– Carrier
10