User's Manual Part 2
Prepare to Leave the Site
MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU 8-3
PRELIMINARY
External Test Equipment
Removal
Perform the procedure in Table 8-3 to disconnect the test equipment and
configure the BTS for active service.
Table 8-3: Remove External Test Equipment
Step Action
1
n WARNING
Be sure no BBXs are keyed before performing this step. Failure to do so can result in personal injury
and damage to BTS LPAs.
Disconnect all external test equipment from all TX and RX connectors at the rear of the frame.
2
Reconnect and visually inspect all TX and RX antenna feed lines at the frame RF interface panel.
NOTE
Verify that all sector antenna feed lines are connected to the correct antenna connectors on the frame.
Crossed antenna cables will degrade call processing.
Bringing Modules into Service
with the LMF
Whenever possible, have the CBSC/MM bring up the site
and enable all devices at the BTS.
NOTE
If there is a reason code and/or data should or could not be loaded
remotely from the CBSC, follow the steps outlined in Table 8-4 as
required to bring BTS processor modules from OOS to INS state.
Table 8-4: Bring Modules into Service
Step Action
1 In the WinLMF GUI environment, select the device(s) to be enabled by clicking on each one.
NOTE
S The GLI and CSA must be INS_ACT (bright green) before an MCC can be enabled.
S Processors which must be enabled and the order of enabling are as follows:
1. GLI
2. CSA
3. MCCs
2 Click on Device in the BTS menu bar, and select Enable from the pull–down list.
– A status report window is displayed.
3
NOTE
If a BBX is selected, a transceiver parameters window is displayed to collect keying information. Do
not enable the BBX.
. . . continued on next page
8