User's Manual Part 2

RX FER Acceptance Test – continued
PRELIMINARY
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
MAY 2004
7-22
Table 7-9: Test FER
Step Action
7 Verify that the correct channel number for the selected carrier is shown in the Carrier # Channels
box.
If it is not, obtain the latest bts–#.cdf and cbsc–#.cdf files from the CBSC.
8
NOTE
If necessary, the correct channel number may be manually entered into the Carrier # Channels box.
9
* IMPORTANT
If a companion frame with the inter–frame diversity RX cabling disconnected is being tested do not
select BOTH in this step. The RX main and diversity paths must be tested separately for this
configuration because each requires a different Multi–Coupler Preselector type to provide the proper
test signal gain.
10 Select the appropriate RX branch (Both, Main, or Diversity) in the drop–down list.
11 In the Rate Set box, select the appropriate data rate (1=9600, 2=14400, 3=9600 1X) from the
drop–down list.
12
NOTE
The Rate Set selection of 3 is only available if 1X cards are selected for the test.
13 Click OK to display a status bar followed by a Directions pop-up window.
14 Follow cable connection directions as they are displayed, and click the Continue button to begin
testing.
As the ATP process is completed, results will be displayed in the status report window.
15 Click the Save Results or Dismiss button.
NOTE
If Dismiss is used, the test results will not be saved in the test report file.
7