User's Manual Part 2
Initial Power–Up Test – continued
MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU 5-13
PRELIMINARY
Table 5-12: TME DC Initial Power–Up Test
Step Action
11 If not already done, connect PDA to BTS. (Three appropriately marked cables .)
12 Engage (push in) TME circuit breaker on PDA.
NOTE
Fans on HMS and BTS begin to operate. With TME cable connected the controller for the HMS and
BTS is bypassed, and DC power is supplied as long as the TME circuit breaker is engaged.
13 Using a DMM set to VDC, measure the voltage at the BTS DC Input connector. DMM should indicate
–60 to –40 VDC (or +20 to +34 VDC).
14 Using a DMM set to VDC, measure the voltage at the HMS Controller connector. DMM should
indicate –60 to –40 VDC (or +20 to +34 VDC).
15 If the 1U connector is being used, engage 1U circuit breaker (push in), use a DMM set to VDC to
measure the voltage at the 1U unit connector. DMM should indicate –60 to –40 VDC (or +20 to +34
VDC).
NOTE
If 1U connector is not in use, do not measure at this time.
5