User's Manual Part 2
Automated Acceptance Test Procedure – Introduction – continued
MAY 2004
7-3
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
PRELIMINARY
1. All transmit connectors must be properly terminated
for all ATP tests.
2. Before the FER is run, be sure that one of the
following is done:
– All transmitter connectors are properly terminated
OR
– The Compact PA is turned OFF (circuit breakers
pulled)
Failure to observe these warnings may result in bodily
injury or equipment damage.
WARNING
EV–DO Optimization and ATP
Appendix A contains procedures for testing the DO card using the LMF.
The procedures are unproven at this time. To load the DO card, the Local
Maintenance Tool (LMT) must be used. For further information on the
LMT refer to the following manuals:
S LMT Command References – 68P09258A03
S LMT Operator’s Guide – 68P09258A04
There are ATP tests available specifically for DO. For further
information refer to the following manual:
S 1xEV–DO System ATP – 68P09258A02
7