User's Manual Part 1
Introduction – continued
PRELIMINARY
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
MAY 2004
1-2
Chapter 7
“Acceptance Test Procedures” – This chapter contains general
information and procedures for testing the BTS.
Chapter 8
“Leaving the Site” – This chapter contains general information and
procedures for preparing to leave and departing the site.
Chapter 9
“Field Replaceable Units” – This chapter contains general information
and procedures for removing and installing boards, cards and modules of
the BTS.
Chapter 10
“Reference Procedures Performed at OMC–R ” – This chapter contains
general information and procedures to be followed by the OMC–R
operator.
Appendix A
“MCC–Data Only ” – This appendix contains general information and
test procedures for the DO card.
Appendix B
“Test Equipment Preparation ” – This appendix contains general
information and procedures for setting up the test equipment.
Appendix C
“Download ROM Code ” – This appendix contains general information
and procedures for the loading ROM code into the BTS cards.
Appendix D
“MMI Cable ” – This appendix contains general information and
procedures for making an MMI cable.
Appendix E
“Expansion BTS Configuration” – This appendix contains general
information and interconnect diagrams for expansion configuration.
Appendix F
“Logical BTS LAN Configuration for Compact BTS (Indoor) ” – This
appendix contains general information and interconnect diagrams for
logical BTS.
Appendix G
“Integrated BTS Router Preliminary Operations” – This appendix
contains general information and procedures IBR and span line
verification.
1