User's Manual Part 1

Installation Completion Checklist – continued
PRELIMINARY
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
MAY 2004
4-78
Table 4-42: Indoor Installation Completion Checklist
Status NotesItemNo.
16 TME is cabled to PDE and cCLPA through
conduit and conduit hubs on TME are tight.
17 PDE is cabled to TME through conduit and
conduit hubs on PDE are tight.
18 cCLPA is cable to TME through conduit and
and conduit hubs on cCLPA are tight.
19 Conduit is sufficiently grounded.
20 200–240 VAC is connected to PDE.
21 Battery backups (if used) are connected to the
PDE.
22 TME DC power cable is connected (through
conduit) to PDE (Outdoor)
23 cCLPA DC power cable is connected through
conduit) to PDE
24 RGPS head and mast are secure.
25 RGPS head has a clear view of the sky and is
not in a location which accumulates debris.
Make sure the RGPS is located away from
the BTS transmit antenna.
26 Local GPS antenna is secure. (If used)
27 Local GPS cabling is installed (If used).
28 Mounting rack is isolated from the Master
ground. (Indoor)
29 cCLPA is securely mounted to rack (if in
use). (Indoor)
30 Compact BTS connection to the DC source is
secure. (Indoor)
31 cCLPA connection to its DC source is secure.
(Indoor)
32 The antenna connections are secure.
33 The antenna cables are protected by lightning
arrestors (if applicable).
34 Span and RGPS connections are protected by
lightning arrestors (if applicable).
35 The RGPS ground lead is connected to the
BTS digital ground reference.
table continued next page
4