User's Manual Part 1

Power Distribution Enclosure Installation – continued
PRELIMINARY
1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU
MAY 2004
4-36
Materials
Tools
The following tools are required to install the PDE:
S Torque Screwdriver
S Drill, 3/8–inch or 1/2–inch drive
S Appropriate concrete or wood drill Bits
S Tie–wraps
S Alarms connector, 8–pin in–line, (Tyco, part number 103958–7)
customer supplied
S Bucklestrap Cutting Tool (Motorola P/N 6604809N01) for pole
mounting bracket assembly
PDE Installation
Figure 4-25 shows the Wall Mounting Bracket. and Mounting Bracket
Assembly.
Slots for hangging the TME
Isolation
Pad
Isolation
Washer
Shoulder
Washer
M6 Screw
Pole
Mounting
Straps
Pole Rest
Figure 4-25: Wall Mounting Bracket and Pole Mounting Bracket Assembly
ti–cdma–wp–00317–v01–ildoc–ah