Instruction Manual
Table Of Contents
- Contents
- Figures
- Tables
- General Safety
- Introduction
- Preliminary Operations
- Optimization/Calibration
- Automated Acceptance Test Procedures (ATPs)
- Leaving the Site
- Basic Troubleshooting
- Data Sheets
- Test Matrix
- BBX Gain Set Point vs BTS Output
- CDMA Operating Frequency
- PN Offset/I & Q Register
- Test Equipment Preparation
- In-Service Calibration
- Index
Preparing the LMF – continued
DRAFT
SC4812ET BTS Optimization/ATP — CDMA LMF
Apr 2001
3-18
Á
Á
Á
Á
Á
Á
RFDS
EBA
ETIB
LMF BNC “T” CONNECTIONS
ON LEFT SIDE OF FRAME
(ETHERNET “A” SHOWN;
ETHERNET “B” COVERED
WITH VELCRO TAPE)
LMF COMPUTER
TERMINAL WITH
MOUSE
PCMCIA ETHERNET
ADPATER & ETHERNET
UTP ADAPTER
UNIVERSAL TWISTED
PAIR (UTP) CABLE (RJ11
CONNECTORS)
10BASET/10BASE2
CONVERTER CONNECTS
DIRECTLY TO BNC T
115 VAC POWER
CONNECTION
FW00168
SC4812ET RF CABINET
NOTE:
Open LAN CABLE ACCESS
door. Pull apart Velcro tape and
gain access to the LAN A or LAN
B LMF BNC connector.
Figure 3-4: LMF Connection Detail
3