Instruction Manual
Table Of Contents
- Contents
- Figures
- Tables
- General Safety
- Introduction
- Preliminary Operations
- Optimization/Calibration
- Automated Acceptance Test Procedures (ATPs)
- Leaving the Site
- Basic Troubleshooting
- Data Sheets
- Test Matrix
- BBX Gain Set Point vs BTS Output
- CDMA Operating Frequency
- PN Offset/I & Q Register
- Test Equipment Preparation
- In-Service Calibration
- Index
Index – continued
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Index-3
Enable CSMs & BDCs, 3-30
Equipment Overview, 1-13
Equipment warm-up, 3-44
Ethernet LAN
interconnect diagram, 3-19
transceiver, 1-7
Every test fails, Troubleshooting, RFDS, 6-19
F
fer test, 4-11
Files, calibration data file, BLO, 3-61
Folder Structure Overview, 3-13, 3-15
Frame, equipage preliminary operations, 2-1
FREQ Monitor Connector, CSM, 6-23
Frequency counter, optional test equipment, 1-10
G
Gain set point, C-1
General optimization checklist, test data sheets, A-4
Gigatronics 8542B power meter, illustration, F-20
GLI Connector, 6-13
GLI Ethernet A and B Connections, 6-14
GLI LED Status Combinations, 6-24
GLI Pushbuttons and Connectors, 6-25
GLI2, 1-18
GLI2 Front Panel Operating Indicators, 6-25
GPIB, F-1, F-5, F-7
GPIB Cables, 1-8
GPS, receiver operation, test data sheets, A-5
GPS Initialization/Verification
estimated position accuracy, 3-35
surveyed position accuracy, 3-35
GPS satellite system, 3-30
Graphical User Interface Overview , 3-21
H
Hardware Requirements, 1-5
High Stability 10 MHz Rubidium Standard, 1-10
High–impedance Conductive Wrist Strap, 1-9
HP 83236A, F-5
HP8921A, F-5
HP8935 Analyzer, 1-8
HSO, 1-18
HSO Initialization/Verification, 3-32
I
I and Q values, E-1
In–Service Calibration, G-5
Initial HP8921A setup, F-10
Initial Installation of Boards/Modules, preliminary
operations, 2-1
Initial power tests, test data sheets, A-3
Installation and Update Procedures, 3-10
Inter–frame cabling, when to optimize, B-2
Intercabinet I/O, 1-20
Internal FRU, 1-27
Internal FRUs, 1-17
IS–97 specification, E-1
ISB Inter Shelf Bus connectors, 6-13
L
LAN, BTS frame interconnect, illustration, 3-19
LED Status Combinations for all Modules except
GLI2 CSM BBX2 MCC24 MCC8E, 6-21
LFR, 1-18
receiver operation, test data sheets, A-6
LMF, 3-10, F-1, F-7
to BTS connection, 3-4, 3-9, 3-17
view CDF information, 3-3
LMF Removal, 5-3
Load Center Wiring, 2-5
Local Area Network (LAN) Tester, 1-10
Logging In to a BTS, 3-22
Logging Out, 3-24
LORAN–C Initialization/Verification, 3-40
LPA errors, 6-5
LPA Module LED, 6-27