Instruction Manual
Table Of Contents
- Contents
- Figures
- Tables
- General Safety
- Introduction
- Preliminary Operations
- Optimization/Calibration
- Automated Acceptance Test Procedures (ATPs)
- Leaving the Site
- Basic Troubleshooting
- Data Sheets
- Test Matrix
- BBX Gain Set Point vs BTS Output
- CDMA Operating Frequency
- PN Offset/I & Q Register
- Test Equipment Preparation
- In-Service Calibration
- Index
Optimization Overview – continued
DRAFT
SC4812ET BTS Optimization/ATP — CDMA LMF
Apr 2001
1-4
Required Documents
The following documents are required to perform optimization of the
cell site equipment:
Site document (generated by Motorola systems engineering), which
includes:
– General site information
– Floor plans
– Power levels
– Site PN
– Site paging and traffic channel allocation
– Board placement
– Site wiring lists
– Cell–site Data Files (CDF)
Demarcation document (scope of work agreement)
Equipment manuals for non-Motorola test equipment.
Additional Information
For other information, refer to the following manuals:
CDMA LMF Operators Guide
Delivered as on-line help with your system
4812ET Field Replacement Units Guide
(Motorola part number 68P09253A48)
SC 4812ET RF & Power Cabinet Hardware Installation Manual
(Motorola part number 68P09253A93)
Logical BTS Implementation
(Motorola part number 68P09253A79)
Test Equipment Overview
The LMF is used in conjunction with Motorola recommended test
equipment, and it is a part of a “calibrated test set.” To ensure consistent,
reliable, and repeatable optimization test results, only recommended test
equipment supported by the LMF must be used to optimize the BTS
equipment. Table 1-1 outlines the supported test equipment that meets the
technical criteria required for BTS optimization.
Table 1-1: CDMA LMF Test Equipment Support Table
Item Description
Hewlett Packard, model
HP 8921A
Cellular communications analyzer
(includes 83203B CDMA interface
option)
Hewlett Packard, model
HP 83236A
PCS interface for PCS band
. . . continued on next page
1