Instruction Manual

Appendix B: FRU Optimization/ATP Test Matrix continued
Apr 2001
B-3
SC4812ET BTS Optimization/ATP CDMA LMF
DRAFT
If any significant change in signal level results from any
component being replaced in the RX or TX signal flow
paths, it would be identified by rerunning the RX and TX
calibration audit command.
NOTE
When the CIO is replaced, the CCCP shelf remains powered up. The
BBX2 boards may need to be removed, then reinstalled into their
original slots, and redownloaded (code and BLO data). RX and TX
calibration audits should then be performed.
B