Instruction Manual
Table Of Contents
- Contents
- Figures
- Tables
- General Safety
- Introduction
- Preliminary Operations
- Optimization/Calibration
- Automated Acceptance Test Procedures (ATPs)
- Leaving the Site
- Basic Troubleshooting
- Data Sheets
- Test Matrix
- BBX Gain Set Point vs BTS Output
- CDMA Operating Frequency
- PN Offset/I & Q Register
- Test Equipment Preparation
- In-Service Calibration
- Index
Appendix A: Optimization (Pre–ATP) Data Sheets – continued
DRAFT
SC4812ET BTS Optimization/ATP — CDMA LMF
Apr 2001
A-2
Site Checklist
Table A-2: Site Checklist
OK Parameter Specification Comments
Deliveries Per established procedures
Floor Plan Verified
Inter Frame Cables:
Ethernet
Frame Ground
Power
Per procedure
Per procedure
Per procedure
Factory Data:
BBX2
Test Panel
RFDS
Per procedure
Per procedure
Per procedure
Site Temperature
Dress Covers/Brackets
Preliminary Operations
Table A-3: Preliminary Operations
OK Parameter Specification Comments
Shelf ID Dip Switches Per site equipage
Ethernet LAN verification Verified per procedure
Comments:_________________________________________________________
A