Instruction Manual
Table Of Contents
- Contents
- Figures
- Tables
- General Safety
- Introduction
- Preliminary Operations
- Optimization/Calibration
- Automated Acceptance Test Procedures (ATPs)
- Leaving the Site
- Basic Troubleshooting
- Data Sheets
- Test Matrix
- BBX Gain Set Point vs BTS Output
- CDMA Operating Frequency
- PN Offset/I & Q Register
- Test Equipment Preparation
- In-Service Calibration
- Index
CCP Backplane Troubleshooting – continued
Apr 2001
6-15
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Digital Control Problems
No GLI2 Control via LMF (all GLI2s)
Table 6-15: No GLI2 Control via LMF (all GLI2s)
Step Action
1 Check the ethernet for proper connection, damage, shorts, or
opens.
2 Verify C–CCP backplane Shelf ID DIP switch is set correctly.
3 Visually check the master GLI2 connector (both board and
backplane) for damage.
4 Replace the master GLI2 with a known good GLI2.
No GLI2 Control through Span Line Connection (All GLI2s)
Table 6-16: No GLI2 Control through Span Line Connection (Both
GLI2s)
Step Action
1 Verify C–CCP backplane Shelf ID DIP switch is set correctly.
2 Verify that the BTS and GLI2s are correctly configured in the
OMCR/CBSC data base.
3 Visually check the master GLI2 connector (both board and
backplane) for damage.
4 Replace the master GLI2 with a known good GLI2.
5 Check the span line inputs from the top of the frame to the
master GLI2 for proper connection and damage.
Table 6-17: MGLI2 Control Good – No Control over Co–located
GLI2
Step Action
1 Verify that the BTS and GLI2s are correctly configured in the
OMCR CBSC data base.
2 Check the ethernet for proper connection, damage, shorts, or
opens.
3 Visually check all GLI2 connectors (both board and
backplane) for damage.
4 Replace the remaining GLI2 with a known good GLI2.
6