User's Manual
Prepare to Leave the Site
68P64115A18–1
Mar 2003
1X SC 4812T Lite BTS Optimization/ATP Software Release R2.16.1.x
DRAFT
5-4
Prepare to Leave the Site
Removing External Test Equipment
Perform the procedure in Table 5-3 to disconnect the test equipment and
configure the BTS for active service.
Table 5-3: Remove External Test Equipment
Step Action
1
n WARNING
Be sure no BBXs are keyed before performing this step. Failure to do so can result in personal injury
and damage to BTS LPAs.
Disconnect all external test equipment from all TX and RX connectors at the rear of the frame.
2
Reconnect and visually inspect all TX and RX antenna feed lines at the frame RF interface panel.
NOTE
Verify that all sector antenna feed lines are connected to the correct antenna connectors on the frame.
Crossed antenna cables will degrade call processing.
Reset All Devices and Initialize Site Remotely
Generally, devices in the BTS should not be left with data and code
loaded from the LMF. The configuration data and code loads used for
normal operation could be different from those stored in the LMF files.
By resetting all devices, the required data and code can be loaded from
the CBSC using the DLM when spans are again active.
To reset all devices and have the OMCR/CBSC bring up the site
remotely, perform the procedure in Table 5-4.
Table 5-4: Reset BTS Devices and Remote Site Initialization
Step Action
1 Terminate the LMF session by following the procedures in Table 5-6.
2 Cycle BTS power off, as specified in Table 2-9 and Table 2-10, and on, as specified in Table 2-11 and
Table 2-12.
3 Reconnect spans by following the procedure in Table 5-7.
4 Notify the OMCR/CBSC to take control of the site and download code and data to the BTS.
5 Verify the CBSC can communicate with the GLIs.
5