User's Manual

Table Of Contents
BTS 120 Degree Sector (3 Sector) Transmit Path Cabling
68P64115A19–4
Mar 2003
1X SC 4812T-MC BTS Hardware Installation - Software Release R2.16.1.x
CONTROLLED INTRODUCTION
2-36
Procedure
Install each cable by using the cable run list in Table 2-27, the cabling
diagram in Figure 2-15, and the procedure in Table 2-28. Each cable is
installed the same way.
Table 2-28: Installing the 120 Degree Sector TX Path Cables
Step Action
1 Attach the connector–equipped end of the cables to the BTS TX connectors.
2 Route the cables to the lightning arrestors.
3 Cut the cables to length and label them accordingly. Install connectors on the cables and attach the
cables to the Lightning Arrestors.
2