User's Manual

Table Of Contents
BTS 60 Degree Sector (6 Sector) Receive Path Cabling
68P64115A194
Mar 2003
1X SC 4812T-MC BTS Hardware Installation - Software Release R2.16.1.x
CONTROLLED INTRODUCTION
2-33
Table 2-23: Cables Needed for 120 Degree Sector Receive Path
Cable Qty. Part Number Description
G 12 CGDS2212602 15 ft. Jumper Cable, N/M–N/M.
Table 2-24: Cable Run List for 60 Degree Sector Receive Path Cabling
Cable
Cable path connecting Lightning Arrestors
to BTS RX connectors
RX CONNECT
RX Ports Used
Quantity
6 MAIN RX 1A–6A
Q
uant
i
ty
6 DIVERSITY RX 1B–6B
Procedure
Install each cable by using the cable run list in Table 2-23, the cabling
diagram in Figure 2-14, and the procedure in Table 2-25. Each cable is
installed the same way.
Table 2-25: Installing the 60 Degree Sector Receive Path Cables
Step Action
1 Attach the connector–equipped end of the cables to the BTS RX connectors.
2 Route the cables to the lightning arrestors.
3 Cut the cables to length and label them accordingly. Install connectors on the cables.
2