User's Manual
Table Of Contents
- SC 4812T-MC vs SC 4812T BTS Read Me First (Comparison)
- Contents
- Chapter 1 Manual Overview and BTS General Information
- Chapter 2 Inter-Frame Cabling
- Inter-Frame Cabling
- Cable Connections
- Cabling Diagrams and Descriptions
- Alarm / Span Cabling
- Equipment Compliance
- BTS System Timing Options
- RF Global Positioning Satellite (RF GPS) Cabling
- Remote Global Positioning Satellite (RGPS) Cabling
- Low Frequency Receiver / High Stability Oscillator (LFR/HSO) Cabling
- BTS Antenna Configuration
- BTS 60 Degree Sector (6 Sector) Transmit Path Cabling
- BTS 60 Degree Sector (6 Sector) Receive Path Cabling
- BTS 120 Degree Sector (3 Sector) Transmit Path Cabling
- BTS 120 Degree Sector (3 Sector) Receive Path Cabling
- Earth Ground Cabling
- BTS Power Cabling
- Chapter 3 Expansion Frame Cabling and Installation
- Expansion Frame (+27 V BTS Configuration)
- Expansion Frame Inter-Frame Cabling
- Expansion of the +27 V Frame
- RF GPS Expansion Installation
- Remote GPS Distribution Expansion
- High Stability Oscillator Expansion (HSOX)
- Local Area Network (LAN) Expansion Installation
- Setting Frame C-CCP Shelf Configuration Switch
- Chapter 4 Optional Equipment
- Optional BTS Equipment Identification
- BTS Antenna Configuration
- BTS 60 Degree Sector (6 Sector) Transmit Path Cabling
- BTS 60 Degree Sector (6 Sector) Receive Path Cabling
- BTS 120 Degree Sector (3 Sector) Transmit Path Cabling
- BTS 120 Degree Sector (3 Sector) Receive Path Cabling
- 3 Sector Non-Duplexed Cabling
- 3 Sector Duplexed
- 6 Sector Duplexed
- Chapter 5 What's Next and Site Cleanup
- Appendix A Carrier Add Instructions
- Index
Index
68P64115A19–4
CONTROLLED INTRODUCTION
Mar 2003
1X SC 4812T-MC BTS Hardware Installation - Software Release R2.16.1.x
Index-3
EMPC, 1-3
Environment, 5-3
Equipment Compliance, 2-18
ETM, 1-3
Expansion Cable/Hardware Descriptions, 3-2
Expansion Frame (+27 V BTS Configuration), 3-2
Expansion Frame cabling diagram, 3-6
Expansion Frame I/O Plate, 2-5
Expansion Frame Inter–Frame Cabling, 3-7
Expansion I/O plate, 3-3
External Components, 1-10
F
Foreword, xiii
Frame Identification, 1-8
FRU, 1-3
FSI, 1-3
G
General Safety, xv
GLI, 1-3
Global Positioning System (GPS), 3-10
GPS, 1-3
H
HSO, 1-3
HSO expansion procedure, 3-13
I
I&Q, 1-3
I/O Plate, 1-9
In–Frame Components, 1-10
Install earth grounding cables, 2-40
Installation Completion Checklist, 5-4
Installation completion checklist, 5-4
Installing Power Cables, 2-47
Installing RF Cables, 4-19, 4-21, 4-24
Inter–frame cables, 3-2
L
LAPD, 1-3
LFR, 1-3
LFR cable cable L pin/signal information, 2-25
Lighting fixtures, 5-3
LMF, 1-3
Local Area Network (LAN) Expansion Installation,
3-14
LORAN, 1-3
Low Frequency Receiver / High Stability Oscillator
(LFR/HSO) Cabling, 2-24
LPA, 1-3
M
Manual Overview, Abbreviations and Acronyms, 1-2
Manual Structure, 1-2
Materials, 5-3
MC, 1-3
MC CLPA Cage, 1-10
MCC, 1-3
MCIO, 1-3
MCM, 1-4
MGLI, 1-4
MM, 1-4
MMI, 1-4
MPC, 1-4
MSC, 1-4
O
OMCR, 1-4
Omni/Omni systems, 2-9
Optimize the system, 5-2
Optional BTS Equipment Identification, 4-2
Overall Cabling Diagram (Single Frame), 2-9
P
PAC, 1-4
PCS, 1-4
Pin/Signal Information for ARM A Cable, 2-16, 2-17
PLC, 1-4
PN, 1-4