User's Manual
Table Of Contents
- SC 4812T-MC vs SC 4812T BTS Read Me First (Comparison)
- Contents
- Chapter 1 Manual Overview and BTS General Information
- Chapter 2 Inter-Frame Cabling
- Inter-Frame Cabling
- Cable Connections
- Cabling Diagrams and Descriptions
- Alarm / Span Cabling
- Equipment Compliance
- BTS System Timing Options
- RF Global Positioning Satellite (RF GPS) Cabling
- Remote Global Positioning Satellite (RGPS) Cabling
- Low Frequency Receiver / High Stability Oscillator (LFR/HSO) Cabling
- BTS Antenna Configuration
- BTS 60 Degree Sector (6 Sector) Transmit Path Cabling
- BTS 60 Degree Sector (6 Sector) Receive Path Cabling
- BTS 120 Degree Sector (3 Sector) Transmit Path Cabling
- BTS 120 Degree Sector (3 Sector) Receive Path Cabling
- Earth Ground Cabling
- BTS Power Cabling
- Chapter 3 Expansion Frame Cabling and Installation
- Expansion Frame (+27 V BTS Configuration)
- Expansion Frame Inter-Frame Cabling
- Expansion of the +27 V Frame
- RF GPS Expansion Installation
- Remote GPS Distribution Expansion
- High Stability Oscillator Expansion (HSOX)
- Local Area Network (LAN) Expansion Installation
- Setting Frame C-CCP Shelf Configuration Switch
- Chapter 4 Optional Equipment
- Optional BTS Equipment Identification
- BTS Antenna Configuration
- BTS 60 Degree Sector (6 Sector) Transmit Path Cabling
- BTS 60 Degree Sector (6 Sector) Receive Path Cabling
- BTS 120 Degree Sector (3 Sector) Transmit Path Cabling
- BTS 120 Degree Sector (3 Sector) Receive Path Cabling
- 3 Sector Non-Duplexed Cabling
- 3 Sector Duplexed
- 6 Sector Duplexed
- Chapter 5 What's Next and Site Cleanup
- Appendix A Carrier Add Instructions
- Index
Carrier Add Instructions
68P64115A19–4
Mar 2003
1X SC 4812T-MC BTS Hardware Installation - Software Release R2.16.1.x
CONTROLLED INTRODUCTION
A-2
Carrier Add Instructions
Overview
This section of the manual has been added to provide details instructions
for installing one or more additional carriers to a SC 4812T–MC BTS
frame.
NOTE
Before you begin the add carrier install, check the Carrier Add
T–Option number listed below (check with a Motorola Account
Team representative for any changes to the kit number).
Tool & Torque Requirements
Tools
S T15 TORX bit
S Torque Driver
Torque Requirements
S 1.1–1.3 N–m (10–12 in.–lb)
T– Options
S For T–MC frames with 3x3 ETM:
– T423AZ Standard Power 3 CLPA Set, (3 x STLF1098)
– T602AA PA Fan Tray Set for 3 Quadrants, (3 x STLN4500)
S For T–MC frames with 4x4 ETM:
– T423BA High Power 4 CLPA CLPA Set, (4 x STLF1098)
– T602AB PA Fan Tray Set for 4 Quadrants, (4 x STLN4500)
Carrier Add Matrix (3 Sector)
NOTE
After completing the installation steps for carrier add, calibrate,
optimize, and ATP the new carrier. Enable the new carrier at a
low power level.
CAUTION
If the ATP is not possible during peak air time, download a
default BLO (40 dB) and enable BBX carrier.
NOTE
All PAs for the carrier under test must be INS during testing. For
carriers not under test, key one BBX per carrier to a minimum
power level.
A