1X SC 4812T-MC BTS Hardware Installation - Software Release R2.16.1.x
CONTROLLED INTRODUCTION
5-2
What’s Next
Introduction
Before beginning the Optimization procedure, there are two things left to
do.
S Clean up the site.
S Fill out the installation completion checklist.
Clean Up the Site
Clean up the site by following the information given in the “Site
Cleanup” area in this chapter.
Fill Out Checklist
After the site is cleaned up, fill out the installation completion checklist.
This checklist is located in the “Installation Completion Checklist” area
of this chapter.
Optimize the System
Optimize the system by following the procedures given in the
appropriate optimization manual for your site.
The hardware installation manual does not include card placement and
turning on power. These procedures are covered in the appropriate
optimization manual.