User's Manual
Table Of Contents
- SC 4812T-MC vs SC 4812T BTS Read Me First (Comparison)
- Contents
- Chapter 1 Manual Overview and BTS General Information
- Chapter 2 Inter-Frame Cabling
- Inter-Frame Cabling
- Cable Connections
- Cabling Diagrams and Descriptions
- Alarm / Span Cabling
- Equipment Compliance
- BTS System Timing Options
- RF Global Positioning Satellite (RF GPS) Cabling
- Remote Global Positioning Satellite (RGPS) Cabling
- Low Frequency Receiver / High Stability Oscillator (LFR/HSO) Cabling
- BTS Antenna Configuration
- BTS 60 Degree Sector (6 Sector) Transmit Path Cabling
- BTS 60 Degree Sector (6 Sector) Receive Path Cabling
- BTS 120 Degree Sector (3 Sector) Transmit Path Cabling
- BTS 120 Degree Sector (3 Sector) Receive Path Cabling
- Earth Ground Cabling
- BTS Power Cabling
- Chapter 3 Expansion Frame Cabling and Installation
- Expansion Frame (+27 V BTS Configuration)
- Expansion Frame Inter-Frame Cabling
- Expansion of the +27 V Frame
- RF GPS Expansion Installation
- Remote GPS Distribution Expansion
- High Stability Oscillator Expansion (HSOX)
- Local Area Network (LAN) Expansion Installation
- Setting Frame C-CCP Shelf Configuration Switch
- Chapter 4 Optional Equipment
- Optional BTS Equipment Identification
- BTS Antenna Configuration
- BTS 60 Degree Sector (6 Sector) Transmit Path Cabling
- BTS 60 Degree Sector (6 Sector) Receive Path Cabling
- BTS 120 Degree Sector (3 Sector) Transmit Path Cabling
- BTS 120 Degree Sector (3 Sector) Receive Path Cabling
- 3 Sector Non-Duplexed Cabling
- 3 Sector Duplexed
- 6 Sector Duplexed
- Chapter 5 What's Next and Site Cleanup
- Appendix A Carrier Add Instructions
- Index
What’s Next
68P64115A19–4
Mar 2003
1X SC 4812T-MC BTS Hardware Installation - Software Release R2.16.1.x
CONTROLLED INTRODUCTION
5-2
What’s Next
Introduction
Before beginning the Optimization procedure, there are two things left to
do.
S Clean up the site.
S Fill out the installation completion checklist.
Clean Up the Site
Clean up the site by following the information given in the “Site
Cleanup” area in this chapter.
Fill Out Checklist
After the site is cleaned up, fill out the installation completion checklist.
This checklist is located in the “Installation Completion Checklist” area
of this chapter.
Optimize the System
Optimize the system by following the procedures given in the
appropriate optimization manual for your site.
The hardware installation manual does not include card placement and
turning on power. These procedures are covered in the appropriate
optimization manual.