BTS 60 Degree Sector (6 Sector) Receive Path Cabling
68P64115A194
Mar 2003
1X SC 4812T-MC BTS Hardware Installation - Software Release R2.16.1.x
CONTROLLED INTRODUCTION
4-11
Table 4-4: Cables Needed for 120 Degree Sector Receive Path
Cable Qty. Part Number Description
G (see Table 4-11) CGDS2212602 15 ft. Jumper Cable, N/M–N/M.
Table 4-5: Cable Run List for 60 Degree Sector Receive Path Cabling
Cable Cable path connecting Lightning Arrestors to BTS RX connectors RX Ports Used
G via Directional Coupler via DDC
RX 1A–6A
Quantity 24 36
RX 1A 6A
RX 1B–6B
Procedure
Install each cable by using the cable run list in Table 4-11, the cabling
diagram in Figure 4-8, and the procedure in Table 4-12. Each cable is
installed the same way.
Table 4-6: Installing the 60 Degree Sector Receive Path Cables
Step Action
1 Attach the connector–equipped end of the cables to the BTS RX connectors.
2 Route the cables to the DDCs.
3 Cut the cables to length and label them accordingly. Install connectors on the cables, and attach the
cables to the DDCs RX connector or Directional Couplers BTS connectors.
4 Attach the connector-equipped end of additional cables to the DDCs or Directional Couplers ANT
connectors.
5 Route the cables to the lightning arrestors.
6 Cut the cables to length and label them accordingly. Install connectors on the cables.