User's Manual
Table Of Contents
- SC 4812T-MC vs SC 4812T BTS Read Me First (Comparison)
- Contents
- Chapter 1 Manual Overview and BTS General Information
- Chapter 2 Inter-Frame Cabling
- Inter-Frame Cabling
- Cable Connections
- Cabling Diagrams and Descriptions
- Alarm / Span Cabling
- Equipment Compliance
- BTS System Timing Options
- RF Global Positioning Satellite (RF GPS) Cabling
- Remote Global Positioning Satellite (RGPS) Cabling
- Low Frequency Receiver / High Stability Oscillator (LFR/HSO) Cabling
- BTS Antenna Configuration
- BTS 60 Degree Sector (6 Sector) Transmit Path Cabling
- BTS 60 Degree Sector (6 Sector) Receive Path Cabling
- BTS 120 Degree Sector (3 Sector) Transmit Path Cabling
- BTS 120 Degree Sector (3 Sector) Receive Path Cabling
- Earth Ground Cabling
- BTS Power Cabling
- Chapter 3 Expansion Frame Cabling and Installation
- Expansion Frame (+27 V BTS Configuration)
- Expansion Frame Inter-Frame Cabling
- Expansion of the +27 V Frame
- RF GPS Expansion Installation
- Remote GPS Distribution Expansion
- High Stability Oscillator Expansion (HSOX)
- Local Area Network (LAN) Expansion Installation
- Setting Frame C-CCP Shelf Configuration Switch
- Chapter 4 Optional Equipment
- Optional BTS Equipment Identification
- BTS Antenna Configuration
- BTS 60 Degree Sector (6 Sector) Transmit Path Cabling
- BTS 60 Degree Sector (6 Sector) Receive Path Cabling
- BTS 120 Degree Sector (3 Sector) Transmit Path Cabling
- BTS 120 Degree Sector (3 Sector) Receive Path Cabling
- 3 Sector Non-Duplexed Cabling
- 3 Sector Duplexed
- 6 Sector Duplexed
- Chapter 5 What's Next and Site Cleanup
- Appendix A Carrier Add Instructions
- Index
BTS 60 Degree Sector (6 Sector) Transmit Path Cabling
68P64115A19–4
Mar 2003
1X SC 4812T-MC BTS Hardware Installation - Software Release R2.16.1.x
CONTROLLED INTRODUCTION
4-9
60 Degree Sector Configuration
Table 4-2 provides the Cable Run List for 60 degree sector transmit
paths.
Table 4-2: Cable Run List for 60 Degree Sector TX Configuration
Cable Cable Parts Connecting Lightning Arrestors To BTS TX Connectors
G via Directional Coupler via DDC BTS TX Ports
Quantity 12 18 TX1 to TX6
Procedure
Install each cable by using the cable run list in Table 4-2, the cabling
diagram in Figure 4-5, and the procedure in Table 4-3. Each cable is
installed the same way.
Table 4-3: Installing the 60 Degree Sector TX Path Cables
Step Action
1 Attach the connector–equipped end of the cables to the BTS TX connectors.
2 Route the cables to the DCs or DDCs.
3 Cut the cables to length and label them accordingly. Install connectors on the cables and attach the
cables to the DDCs TX connector or Directional Couplers BTS connectors.
4 Attach the connector-equipped end of additional cables to the DDCs or Directional Couplers ANT
connectors.
5 Route the cables to the lightning arrestors.
4