User's Manual

Table Of Contents
Span Lines – Interface and Isolation
68P64115A18–1
Mar 2003
1X SC 4812T Lite BTS Optimization/ATP Software Release R2.16.1.x
DRAFT
3-16
T1/E1 Span Isolation
Table 3-4 describes the action required for span isolation.
Table 3-4: T1/E1 Span Isolation
Step Action
1 Have the OMCR/CBSC place the BTS OOS.
2 To disable the span lines, locate the connector for the span or
spans which must be disabled and remove the respective
connector from the applicable SCCP cage Span I/O board
(Figure 3-2).
3