User's Manual

Table Of Contents
Optimization Manual Scope and Layout68P64115A18–1
Mar 2003
1X SC 4812T Lite BTS Optimization/ATP Software Release R2.16.1.x
DRAFT
1-3
Document Composition
This document covers the following major areas:
S Introduction, consisting of preliminary background information (such
as component and subassembly locations and frame layouts) to be
considered by the Cellular Field Engineer (CFE) before performing
optimization or tests.
S Preliminary Operations, consisting of jumper configuration of BTS
sub–assemblies, pre–power–up tests, initial application of power to
the BTS equipment frames, and initial power–up tests.
S Optimization/Calibration, consisting of procedures for downloading
all BTS processor boards, test equipment set–up, RF path verification,
BLO calibration and calibration audit, and Radio Frequency
Diagnostic System (RFDS) calibration.
S Acceptance Test Procedures (ATP), consisting of automated ATP tests,
executed by the LMF, and used to verify all major transmit (TX) and
receive (RX) performance characteristics on all BTS equipment. This
chapter also covers generating an ATP report.
S Prepare to Leave the Site, discussing site turnover after ATP is
completed.
S Basic Troubleshooting, consisting of procedures to perform when an
ATP fails, as well as when incorrect results are obtained during logon,
test equipment operation, calibration, and Global Positioning System
(GPS) operation.
S Appendices include:
Data sheets for CFE’s recording at the site
Pseudorandom Noise (PN) Offset information
Optimization/ATP matrix
BBX Gain set point vs BTS output
CDMA operating frequency programming information
Manual test setup information
Downloading ROM and RAM code
In–service ATP procedures
1