User's Manual

Optimization (Pre–ATP) Data Sheets68P64115A18–1
Mar 2003
1X SC 4812T Lite BTS Optimization/ATP Software Release R2.16.1.x
DRAFT
A-5
General Optimization Checklist
Table A3b: General Optimization Checklist
OK Parameter Specification Comments
Preparing the LMF
Load LMF software
Create site–specific BTS directory
Create HyperTerminal connection
Table 3-1
Table 3-2
Table 3-3
LMF–to–BTS Connection
Verify GLI2 ethernet address settings
Ping LAN A
Ping LAN B
Table 3-5
Table 6-3
Table 3-11
Table 3-11
Verify ROM code loads for software
release
Download/Enable MGLI2
Download/Enable GLI2
Set Site Span Configuration
Set CSM clock source
Enable CSMs
Download/Enable MCCs (24/8E/1X)
Download BBXs (2 or 1X)
Program TSU NAM
Table 3-12
Table 3-13
Table 3-13
Table 6-31
Table 3-15
Table 3-16
Table 3-14
Table 3-14
Table 3-46
Test Set Calibration
Test Cable Calibration
Table 3-25
Table 3-26
Comments:_________________________________________________________
A