User's Manual
Index
68P64115A18–1
DRAFT
Mar 2003
1X SC 4812T Lite BTS Optimization/ATP Software Release R2.16.1.x
Index-9
Troubleshooting
DC Power Problems, 6-24
RF path fault isolation, 6-12
Set span configuration, 6-37
span problems, 6-35
TX and RX Signal Routing, 6-25
TX level accuracy fault isolation, 6-14
troubleshooting
communications system analyzer communication,
6-7
Ethernet LAN, 6-3
GLI IP address, 6-4
LMF login failure, 6-3
power meter communication, 6-6
signal generator communication, 6-7
TSU NAM, programming
description, 3-102
parameter ranges, 3-103
parameters, 3-102
procedure, 3-108
TX
acceptance tests
code domain power/noise floor, 4-24
equipment setup, 4-7
pilot time offset, 4-22
spectral purity mask, 4-17
spectrum analyzer display, 4-19
waveform quality (rho), 4-20
all inclusive TX ATP test, 4-9
antenna VSWR, test data sheets, A-10, A-12
BLO test data sheets, A-9
level accuracy fault isolation, 6-14
output acceptance tests
code domain power noise, 4-15
pilot time offset, 4-15
waveform quality, 4-15
TX and RX Frequency vs Channel , E-3
TX and RX Signal Routing, SCCP Backplane
Troubleshooting, 6-25
TX Audit Test, 3-95
TX calibration, 3-91
All Cal/Audit, 3-92
set–up, 3-63
Advantest R3267, 3-65, H-19
Advantest R3465, 3-64
Agilent 8935, 3-63
Agilent E4406A, 3-65, H-19
CyberTest, 3-63
HP 8921A, 3-64
TX combiners. See 2:1 combiners
tx fine adjust, B-2
TX path. See transmit path
TX path calibration, 3-91
TX/RX OUT Connections, 4-4
U
Updating CDMA LMF Files, 5-2
UTP, LMF to BTS connection, 3-17
V
verification during calibration, 3-84
Verify
test equipment used, test data sheets, A-2
TX output, 4-7
Verify GLI ROM code load, 3-38
W
Waveform quality (Rho), acceptance test procedure,
4-21
X
XCVR Backplane Troubleshooting, 6-20
Xircom Model PE3–10B2
LMF to BTS connection, 3-17
remove from BTS, 5-5