User's Manual
Index
68P64115A18–1
1X SC 4812T Lite BTS Optimization/ATP Software Release R2.16.1.x
DRAFT
Mar 2003
Index-8
RX path. See receive path
S
SC 4812 BTS Optimization/ATP Test Matrix, C-3
SCCP Backplane Troubleshooting, Procedure, 6-21
SCLPA, convergence test data sheets, A-8
Selecting Test Equipment, 3-73
Set Antenna Map Data, 3-104
Set RFDS Configuration Data, 3-105
Setting Cable Loss Values, 3-81
Setting TX Coupler Loss Value, 3-82
shut–down, BTS power. See power, removal
SIF, output considerations vs BBX gain set point, D-2
signal generator, 1X FER acceptance test, 4-7
Site, equipage verification, 3-4
Site checklist, verification data sheets, A-3
Site documents, 1-13
Site equipage, CDF/NECF, 3-3
Site expansion, 1-5
Span I/O board
E1 span isolation, illustration, 3-15
T1 span isolation, illustration, 3-15
Span line
T1/E1 verification equipment, 1-11
troubleshooting, 6-35
Span line configuration, troubleshooting, 6-37
Span Line connector , 6-20
SPANS LED, 6-31
Spectral purity, TX mask – primary and redundant
BBX, 4-15
Spectral purity transmit mask, acceptance test, 4-18
Spectrum analyzer, optional test equipment, 1-11
STATUS LED, GLI, 6-31
Supported Test Sets, 3-56
SYNC Monitor Connector, CSM, 6-30
System Connectivity Test, F-18
T
T1, isolate BTS from the T1 spans, 3-15
Tektronics model 2445 test equipment, 1-11
Test data sheets
Alarm verification, A-12
general optimization checklist, A-5
GPS receiver operation, A-6
initial power tests, A-4
LFR receiver operation, A-7
pre–power tests, A-4
preliminary operations, A-3
RX antenna VSWR, A-12
SCLPA convergence, A-8
site checklist, A-3
TX antenna VSWR, A-10
TX BLO, A-9
verification of test equipment used, A-2
Test Equipment, Calibrating, 3-76
Test equipment
See also Optional test equipment; Required test
equipment
set up, TX output verification/control, 4-7
system analyzer, 1-9
TX acceptance tests, 4-7
verification data sheets, A-2
Test equipment connections , preliminary Agilent
E4406A/E4432B set–up, F-23
Test Equipment Setup Calibration for TX Bay Level
Offset, F-33
Test Equipment Setup Chart, 3-57
Test equipment setup RF path calibration, 3-88
Timing reference cables, required test equipment
Model SGLN1145A/4132A CSMs, 1-10
Model SGLN4132B CSMs, 1-10
transmit path
calibration, 3-83
component verification, 3-84
definition, 3-83
Transmit TX path audit, 3-95
Transmit TX path calibration, 3-88