User's Manual
Index
68P64115A18–1
DRAFT
Mar 2003
1X SC 4812T Lite BTS Optimization/ATP Software Release R2.16.1.x
Index-5
GPIB, F-14, F-18, F-20
cables, 1-10
set address, HP 437B, F-11
GPIB Address
Advantest R3267, F-5
Advantest R3465, F-9
Advantest R3562, F-6
Agilent (formerly HP) 8935, F-7
Agilent E4406A, F-3
Agilent E4432B, F-4
Gigatronics 8541C Power Meter, F-12
Hewlett Packard HP8921a & HP83236A/B, F-8
Motorola CyberTest, F-10
GPIB Interface Box, RS232, F-13
GPS, receiver operation, test data sheets, A-6
GPS Initialization/Verification
estimated position accuracy, 3-48
surveyed position accuracy, 3-48
GPS satellite system, 3-42
Graphical User Interface, 3-19
Group Line Interface. See GLI
GUI, 3-19
H
Hardware Requirements, 1-7
Hewlett Packard HP8921A and HP83236A/B GPIB
Address, F-8
High Stability 10 MHz Rubidium Standard, optional
test equipment, 1-12
High–impedance conductive wrist strap, required test
equipment, 1-10
HP 437
Pre–calibration, F-26
setting GPIB address, F-11
HP 83236A, F-18
HP 8921A PCS interface, Cables Connection for 10
MHz Signal and GPIB , F-15, F-17
HP8921A, F-18
Test equipment connections , F-14
HSO Initialization/Verification, 3-46
Huber & Suhner, required test equipment, 1-10
HyperTerminal, Creating named HyperTerminal
connection, 3-13
HyperTerminal , create named connection, 3-13
I
I and Q values, B-2
In–Service Calibration, H-21
preliminary Agilent test equipment set–up, H-3,
H-6
test set–up diagrams
DRDC, Advantest, 3-69
TRDC, Advantest, 3-71
Initial HP8921A setup, F-29
Initial Installation of Boards/Modules, preliminary
operations, 2-3
Initial power tests, test data sheets, A-4
Intermediate file, generate ATP file using, 4-29
Internal Assemblies and FRUs, 1-20
IS–97 specification, B-2
L
LAN, optional test equipment, 1-11
LAN connectors, external, 2-5
LAN termination, 2-5
LED, CSM, 3-45
LED Status Combinations for all Modules except
GLI2 CSM BBX2 MCC24 MCC8E, 6-28
LFR, receiver operation, test data sheets, A-7
LIF, Load Information File, 3-9
LMF, F-14, F-20
1X FER acceptance test, 4-7
1X upgrade preparation, home directory, 3-8
BTS connection, 3-17
logout procedure, 5-5
platform requirements, 1-7
remove from BTS, 5-5
to BTS connection, 3-15, 3-16
TX acceptance tests, 4-7
view CDF information, 3-4
LMF BTS displays, 3-19
LMF computer and software, 1-7
Load Information File, 3-9
Local Maintenance Facility. See LMF
Log out
of BTS, 5-5
of LMF PC, 5-5
Logging Into a BTS, 3-26
Logging Out, 3-29
Logical BTS, 1-17
Numbering, 1-18
LORAN–C Initialization/Verification, 3-53